Integrated Production and Logistics Planning
Résumé
Industrial planning systems have undergone considerable evolution in recent decades, starting from MRP, then ERP, and finally advanced planning and scheduling systems (APS). This evolution took place by dint of the evolution of information and communication technologies, and also due to industrial stakeholder integration tendency forming global supply chains in order to optimize costs and lead times. The purpose of this article is to present a new integrated short and medium term planning approach for upstream logistics (necessary for procurement) and production, this new approach is the MLRP "Manufacturing and Logistic Requirement Planning ". We introduce in this paper a new bill of materials structure that is adapted to the MLRP, and then we present the proposed algorithm which allows determining production and logistics needs for all bills of materials components. Finally, we present the proposed information system that implements the MLRP.
Citer ce document
Exporter : BibTeX · RIS (Zotero, Mendeley, EndNote)
Accès au document
Texte intégral en lecture en ligne, réservé aux abonnés SPHAERO et aux membres de l'institution. Se connecter
Voir l'article sur le site de la revueLicence et provenance
Licence : CC BY
Notice moissonnée depuis OpenAlex le 31/08/2026. Le document reste hébergé par sa source.
Voir le document à la source →
Auteur(s)
Statistiques
Consultations : 1
Téléchargements : 0