Accès ouvert · CC BY

ASSESSING COST-BENEFIT DYNAMICS OF VALUE MANAGEMENT IN CONSTRUCTION ENTERPRISES IN BAUCHI, NIGERIA

Article scientifique 2026 Sciences économiques et de gestion › Sciences de gestion (OCDE 5.2) Anglais

Résumé

This study assesses the cost-benefit dynamics of Value Management (VM) implementation in construction Enterprises within Bauchi Metropolis, Nigeria, where MSMEs play a crucial role in infrastructural development despite facing challenges in meeting client expectations, profitability, and value delivery. The research aims to: (1) assess the level of VM awareness among professionals; (2) determine VM adoption levels; (3) evaluate the predictive power of awareness on adoption; (4) examine VM implementation experience; and (5) identify barriers to full adoption. Employing a quantitative, descriptive survey design, structured questionnaires were distributed to 85 professionals across five professional bodies, yielding 77 valid responses (response rate: 90.6%). Data analysis involved descriptive statistics (frequencies, percentages, means, standard deviations), regression analysis, and ANOVA. Results showed 84.4% of professionals are aware of VM, with 76.6% actively practicing it, indicating high adoption levels comparable to larger firms. Regression analysis revealed that awareness significantly predicts VM adoption (β = 0.684, R² = 0.468, p < 0.001). The perceived cost of VM was mainly moderate (55.8%), and benefits such as project value enhancement (mean = 4.51) and lifecycle performance (mean = 4.25) outweighed costs. ANOVA indicated a significant difference in business turnover between VM adopters and non-adopters (F = 15.34, p < 0.05), with adopters recording higher turnover (mean = 4.23) versus non-adopters (mean = 2.89). The primary barrier was inadequate VM knowledge (52.0%). The findings suggest VM is economically advantageous for MSMCEs, recommending increased awareness campaigns and training through seminars, workshops, and academic curricula to promote VM adoption.

Citer ce document

Ashen, R. M., Ashen, M. J., Gambo, M. J., & Dang, D. J. (2026). ASSESSING COST-BENEFIT DYNAMICS OF VALUE MANAGEMENT IN CONSTRUCTION ENTERPRISES IN BAUCHI, NIGERIA. Zenodo (CERN European Organization for Nuclear Research). https://doi.org/10.5281/zenodo.21197756

Exporter : BibTeX · RIS (Zotero, Mendeley, EndNote)

Accès au document

Texte intégral archivé sur SPHAERO, en accès ouvert : lisible gratuitement en ligne après connexion. Le document reste aussi disponible à sa source. Se connecter

Voir l'article sur le site de la revue

Licence et provenance

Licence : CC BY

Notice moissonnée depuis OpenAlex le 01/10/2026. Le document reste hébergé par sa source.
Voir le document à la source →

Statistiques

Consultations (hors robots) : 10

Téléchargements (hors robots) : 0

Méthode de comptage