USING MONTE CARLO SIMULATION TO QUANTIFY THE COST IMPACT OF SYSTEMIC RISK FACTORS IN A PROJECT PORTFOLIO: A CASE STUDY

Article scientifique 2021 Sciences mathématiques et statistiques Anglais

Résumé

In terms of project risk management, ‘systemic risk’ is identified as risks which are artefacts of the environment which a project is executed in, and are related to (i) the project team’s actions, (ii) how project controls are managed and interact, and (iii) how the project is planned and executed. This paper proposes a methodology to estimate the cost impact of systemic risk on a portfolio of projects by using risk quantification and Monte Carlo simulation, in the absence of a validated parametric risk model, to estimate the systemic risks in an entire portfolio of projects. The case study simulation results indicate a significant effect of systemic risks on the project portfolio risk profile, where systemic risks increased the P80 value of the contingency requirement by +85.6%. The successful management of systemic risk would contribute to project success by limiting unnecessary waste.

Citer ce document

Joubert, F., & Snyman, M. (2021). USING MONTE CARLO SIMULATION TO QUANTIFY THE COST IMPACT OF SYSTEMIC RISK FACTORS IN A PROJECT PORTFOLIO: A CASE STUDY. The South African Journal of Industrial Engineering. https://doi.org/10.7166/32-4-2518

Exporter : BibTeX · RIS (Zotero, Mendeley, EndNote)

Accès au document

Texte intégral archivé sur SPHAERO, en accès ouvert : lisible gratuitement en ligne après connexion. Le document reste aussi disponible à sa source. Se connecter

Voir l'article sur le site de la revue

Licence et provenance

Licence : CC BY

Notice moissonnée depuis OpenAlex le 06/09/2026. Le document reste hébergé par sa source.
Voir le document à la source →

Statistiques

Consultations (hors robots) : 10

Téléchargements (hors robots) : 0

Méthode de comptage