Assessing the viability of a grid-connected PV power plant in Mubi, Adamawa State, Nigeria
Résumé
This paper is based on a techno-economic analysis and the environmental impact of a proposed 1 MW solar photovoltaic (PV) power plant at the main campus of the Federal Polytechnic Mubi (FPM) in north-eastern Nigeria. A photovoltaic power plant converts solar radiation into electricity that can be used as a source of electrical power to meet the daily energy requirements of homes, equipment, and all tertiary institutions. RETScreen Expert software was used to evaluate the techno-economic and environmental sustainability of installing a grid-connected PV power plant. The research results revealed that with an annual solar radiation of 5.74 kWh/m 2 /day, the maximum annual energy production was estimated to be 1,550.98 MWh. It was discovered that the maximum energy production in March was 146.89 MWh. The project’s profitability and economic sustainability were determined with a good internal rate of return (IRR) of 11.9% and a positive net present value (NPV) of $681,164. The proposed PV power plant has a simple payback period of 11.4 years. The maximum greenhouse gas (GHG) emission reduction is 670.9 tCO 2 , equivalent to 61.7 ha of forest-absorbing carbon emissions.
Citer ce document
Exporter : BibTeX · RIS (Zotero, Mendeley, EndNote)
Accès au document
Texte intégral archivé sur SPHAERO, en accès ouvert : lisible gratuitement en ligne après connexion. Le document reste aussi disponible à sa source. Se connecter
Voir l'article sur le site de la revueLicence et provenance
Licence : CC BY
Notice moissonnée depuis OpenAlex le 26/09/2026. Le document reste hébergé par sa source.
Voir le document à la source →