Ensuring water availability in Mekelle City, Northern Ethiopia: evaluation of the water supply sub-project

Article scientifique 2017 Anglais

Résumé

The need and demand for water in the world are becoming acute with the growing population. This is mostly pressing in developing countries of which Mekelle City in Northern Ethiopia is not an exception. World Bank borehole-support sub-project was aimed at addressing this challenge. The evaluation of the intervention indicates that there is a significant increase in water supply in the city because of the sub-project. However, the increase in water supply has not been able to meet up with the already established and increasing demand. Coupled with this challenge are: the limited capacity of human capital and expertise that will ensure the proper management of borehole interventions; insufficient cost recovery for proper operation and maintenance of the projects; loss of land and farmlands and lack of compensations because of the projects which affect the livelihood.

Citer ce document

Oyedotun, T. D. T. (2017). Ensuring water availability in Mekelle City, Northern Ethiopia: evaluation of the water supply sub-project. Applied Water Science. https://doi.org/10.1007/s13201-017-0568-7

Exporter : BibTeX · RIS (Zotero, Mendeley, EndNote)

Accès au document

Texte intégral en lecture en ligne, réservé aux abonnés SPHAERO et aux membres de l'institution. Se connecter

Voir l'article sur le site de la revue

Licence et provenance

Licence : CC BY

Notice moissonnée depuis OpenAlex le 27/08/2026. Le document reste hébergé par sa source.
Voir le document à la source →

Statistiques

Consultations : 3

Téléchargements : 0