A MULTI-STAGE OPTIMISATION METHOD FOR THE MANAGEMENT OF AN ON-DEMAND FIXTURE MANUFACTURING CELL FOR MASS CUSTOMISATION PRODUCTION SYSTEMS
Résumé
The implementation of reconfigurable fixtures is a major facilitator of mass customisation. Traditional scheduling techniques do not consider reconfigurable fixtures comprehensively. This paper describes a multi-stage optimisation method that manages the recirculation of reconfigurable fixtures in a mass customisation production system. The method was based on an on-demand fixture manufacturing cell that served a part processing cell. The method consists of three stages: using established techniques such as k-means clustering and hierarchical clustering; and a novel mixed integer linear programming (MILP) model to optimise operation sequences. Minimisation of total idle time (and thus makespan) was used as the measure of performance.
Citer ce document
Exporter : BibTeX · RIS (Zotero, Mendeley, EndNote)
Accès au document
Texte intégral archivé sur SPHAERO, en accès ouvert : lisible gratuitement en ligne après connexion. Le document reste aussi disponible à sa source. Se connecter
Licence et provenance
Licence : CC BY
Notice moissonnée depuis OpenAlex le 30/08/2026. Le document reste hébergé par sa source.
Voir le document à la source →